2006


Release time:

2024-07-12

In 2006, a sulfur-based fertilizer production line with an annual capacity of 100,000 tons was completed. From 2007 to 2008, the second phase of the sulfur-based fertilizer project, with an annual capacity of 100,000 tons, was completed.

2006年,建成了年产10万吨的硫基肥生产线。2007-2008年建成硫基二期10万吨/年。

Previous article

Next article

Previous

Next